Level 4 - Drought Conditions - Outdoor Watering w sprinklers/irrigation systems allowed Tues/Sat ONLY, 7:00PM-10:00PM.  Hand watering & car washing allowed anytime.
The Town of Danvers new, easy-to-use online payment platform with more ways to view and pay your utility bill, plus the ability to pay by phone and via text message is now available.

Residential Solar PV Program

Danvers Electric is participating in the Municipal Light Plant Solar Rebate Program (MLP). The MLP process will be administered for DED by Energy New England (ENE)The solar program information, technical requirements and application forms for the MLP can be accessed on the ENE website.

 

Danvers Electric and the Department of Energy Resources (DOER) are pleased to offer qualifying system installations with the below prescriptive rebate:

$1.20 / watt for the first 2kW AC installed capacity ($2,400 max rebate)

 

Please note that the interconnection and application process for all qualified MLP Solar or other Distributed Generation facilities must be completed and filed with the Danvers Electric Division separately. DE will review and approve for interconnection under the terms and agreements of the department's interconnection policy.

Danvers Electric MLP SOLAR REBATE PROGRAM REQUIREMENTS
  • Applicant's electric account must be in good standing
  • Applicant must be either the installer or property owner
  • The solar panels must be installed by a professional, licensed contractor
  • The solar project must meet technical, installation, and equipment requirements outlined in the Program Manual and DE Appendix E - Net Metering Policy
  • The DOER caps projects at 25 kW, but Danvers Electric limits residential solar installations to 10kW AC
  • Be interconnected to Danvers MLP’s distribution system
  • Cannot have received a Statement of Qualification under the Solar Carve-out II Program
  • Interconnections must use a Locus Production Meter

Applications for new solar arrays must be filed with and approved by DE prior to installation. The technical review process will ensure your PV system meets the important industry and Danvers Electric engineering criteria for safe interconnection to our system.

Application Submittal Options:

    Find application online above & e-mail or bring completed application & required attachments to Jeff Elie, jelie@danversma.gov, at Electric Division, 1 Burroughs Street
Close window